HcoRealEstates
Emaar MGF Commerce Park Gurgaon

Emaar MGF Commerce Park Gurgaon

Last Update : Apr 12, 2023
Price
0.82 Cr. Onwards
Sizes
969 - 2421 Sq. Ft.
Offered Payment Plan
PLP, DP
Project Status
Ready to Move

Emaar MGF Commerce Park Specifications

Project Highlights

  • Leed Certified Green Building
  • Landmark Twin Tower with expansive open spaces
  • World-class recreational and business club
  • 1.2 million sq. ft. built-up area
  • Commerce Park is spread over two towers ranging from 10-20 floors
  • Large column free spans
  • Flexible full-floor and part-floor
  • High speed elevators
  • Grand atrium
  • Video surveillance and on-site security
  • Energy efficient Air conditioning
  • Energy saving glazed facade
  • World-class fire and life safety systems
  • Multi-level parking for over 1000 cars in addition to surface parking
  • Convenience retail
  • Multi-purpose Gym
  • Squash Courts
  • Business centre
  • Spa treatment rooms
  • Executive Laundry
  • Concierge services desk
  • Complex wide wi-fi connectivity
  • Provision for restaurant and cafes
  • Meeting Rooms and Exclusive Lounge
  • Fine Dining multi-cuisine Restaurant
  • Central loading / delivery area
  • Mail room and central refuge
  • Exclusive business and recreational club
  • Gurgaon's first temperature-controlled indoor swimming pool

Specifications

  • Façade comprises of curtain wall & strip glazing with high performance glass units and a combination of Textured Paint, Stone and ACP cladding; full length floor-to-ceiling glazing at ground level.
  • Expansive double height entrance lobby features stone and wood veneer panels on the backdrop wall and stone flooring with accent bands & steel inserts; Fully equipped concierge desk.
  • External signage integrated with landscape elements and internal signage integrated with the lobby design.
  • Reinforced Cement Concrete frame structure with column and flat slab construction.
  • Waterproofed RCC roof with inverted rigid insulation.
  • Computerized high-speed traction elevators serving all levels. Separate parking elevators. Access control at main elevator lobby.
  • About Project Project Overview Specifications Specifications Centralized cooling system based on energy efficient water cooled chillers equipped with BMS controls. One chiller on variable frequency drive for efficient operation at partial loads; Chilled water piping provided upto each floor level.
  • About Project Project Overview Specifications Specifications Ducted ventilation systems/smoke extraction facility in basements
  • About Project Project Overview Specifications Specifications Primary source of power is from the Grid; Secondary power through captive generation with heat recovery
  • 100% fully automatic diesel generator for lighting, power & Air-conditioning requirements. Provision made for PLC based auto sharing and auto load balancing AMF panel system.
  • About Project Project Overview Specifications Specifications Automatic fire sprinklers integrated with a fire alarm system installed in all areas; Centrally located main fire alarm control panel provided; Equipped with hand held and yard hydrants; UPS backed emergency light fixtures provided at all means of egress.
  • Video surveillance at all strategic locations covering the site exterior, basements and all critical common areas; Security personnel located at critical entry and exit points.
  • About Project Project Overview Specifications Specifications Tag blocks provided at each level; Provision for 3-4 service providers.
yes, I am Interested
Enquire Now