HcoRealEstates
Sobha City Gurgaon

Sobha City Gurgaon

Last Update : Apr 12, 2023
Price
1.52 Cr. Onwards
Sizes
1381 - 2343 Sq.Ft.
Offered Payment Plan
20 x 5 Payment Plan
Project Status
Ready to Move

Sobha City Gurgaon Price List

Unit Particulars

Type of Apartment

A
Saleable Built-up Area in sq.ft. (SBA) 1,381.01
Carpet Area in sq.ft. 848.20
Basic Sale Value & Other Charges
Basic Sale Value in Rs. (BSV) 14,231,308
Maintenance Deposit in Rs. 276,202
Goods and Services Tax in Rs. (GST) 711,565
Basic Sale Value & Other Charges with GST in Rs. 15,219,075
Payment Schedule
Expression of Interest Amount in Rs. (EOI) 500,000
Booking Amount Payable within 30 Days from EOI Date (Less Expression of Interest Amount Paid) 10%
Payable within 60 Days from EOI Date

10%

Payable within 90 Days from EOI Date 10%
On Completion of Basement Roof Slab 9%
On Completion of First Floor Roof Slab 9%
On Completion of Fifth Floor Roof Slab 8%
On Completion of Ninth Floor Roof Slab 8%
On Completion of Thirteenth Floor Roof Slab 8%
On Completion of Terrace Roof Slab 8%
On Completion of Internal Plastering in all the Apartments Excluding Balconies, Utilities, Common Area, Shafts, Ducts, etc. 8%
On Completion of Internal Flooring in all the Apartments Excluding Balconies, Utilities, Common Area, Shafts, Ducts, etc. 7%
On Offer of Possession - Basic Sale Value, Maintenance Deposit & Service Charges 5%
Unit Particulars

Type of Apartment

B
Saleable Built-up Area in sq.ft. (SBA) 1,711.29
Carpet Area in sq.ft. 1,111.44
Basic Sale Value & Other Charges
Basic Sale Value in Rs. (BSV) 17,634,843
Maintenance Deposit in Rs. 342,258
Goods and Services Tax in Rs. (GST) 881,742
Basic Sale Value & Other Charges with GST in Rs. 18,858,844
Payment Schedule
Expression of Interest Amount in Rs. (EOI) 500,000
Booking Amount Payable within 30 Days from EOI Date (Less Expression of Interest Amount Paid) 10%
Payable within 60 Days from EOI Date

10%

Payable within 90 Days from EOI Date 10%
On Completion of Basement Roof Slab 9%
On Completion of First Floor Roof Slab 9%
On Completion of Fifth Floor Roof Slab 8%
On Completion of Ninth Floor Roof Slab 8%
On Completion of Thirteenth Floor Roof Slab 8%
On Completion of Terrace Roof Slab 8%
On Completion of Internal Plastering in all the Apartments Excluding Balconies, Utilities, Common Area, Shafts, Ducts, etc. 8%
On Completion of Internal Flooring in all the Apartments Excluding Balconies, Utilities, Common Area, Shafts, Ducts, etc. 7%
On Offer of Possession - Basic Sale Value, Maintenance Deposit & Service Charges 5%
Unit Particulars

Type of Apartment

B
Saleable Built-up Area in sq.ft. (SBA) 1,711.29
Carpet Area in sq.ft. 1,111.44
Basic Sale Value & Other Charges
Basic Sale Value in Rs. (BSV) 17,018,779
Goods and Services Tax in Rs. (GST) 850,939
Basic Sale Value with GST in Rs. (A = BSV + GST) 17,869,718
Other Charges
Maintenance Deposit in Rs. 342,258
Service Charges including GST in Rs. 236,000
Total Other Charges in Rs. (B) 578,258
Total Sale Value excluding Registration & Stamp Duty in Rs. (C = A + B) 18,447,976
Payment Schedule
Expression of Interest Amount in Rs. (EOI) 300,000
Booking Amount Payable within 30 Days from EOI Date (Less EOI Amount Paid) 10% of A
Payable within 60 Days from EOI Date

10% of A

Payable within 90 Days from EOI Date 20%
On Completion of First Floor Roof Slab 10%
On Completion of Fifth Floor Roof Slab 10%
On Completion of Ninth Floor Roof Slab 10%
On Completion of Thirteenth Floor Roof Slab 10%
On Completion of Terrace Roof Slab 10%
On Completion of Internal Plastering in all the Apartments Excluding Balconies, Utilities, Common Area, Shafts, Ducts, etc. 5%
On Offer of Possession - Basic Sale Value (A) & Other Charges (B) 5%
Unit Particulars

Type of Apartment

C
Saleable Built-up Area in sq.ft. (SBA) 2,003.45
Carpet Area in sq.ft. 1,280.17
Basic Sale Value & Other Charges
Basic Sale Value in Rs. (BSV) 19,924,310
Goods and Services Tax in Rs. (GST) 996,216
Basic Sale Value with GST in Rs. (A = BSV + GST) 20,920,526
Other Charges
Maintenance Deposit in Rs. 400,690
Service Charges including GST in Rs. 236,000
Total Other Charges in Rs. (B) 636,690
Total Sale Value excluding Registration & Stamp Duty in Rs. (C = A + B) 21,557,216
Payment Schedule
Expression of Interest Amount in Rs. (EOI) 300,000
Booking Amount Payable within 30 Days from EOI Date (Less EOI Amount Paid) 10% of A
Payable within 60 Days from EOI Date

10% of A

Payable within 90 Days from EOI Date 20%
On Completion of First Floor Roof Slab 10%
On Completion of Fifth Floor Roof Slab 10%
On Completion of Ninth Floor Roof Slab 10%
On Completion of Thirteenth Floor Roof Slab 10%
On Completion of Terrace Roof Slab 10%
On Completion of Internal Plastering in all the Apartments Excluding Balconies, Utilities, Common Area, Shafts, Ducts, etc. 5%
On Offer of Possession - Basic Sale Value (A) & Other Charges (B) 5%
Unit Particulars

Type of Apartment

B
Saleable Built-up Area in sq.ft. (SBA) 1,711.29
Carpet Area in sq.ft. 1,111.44
Basic Sale Value & Other Charges
Basic Sale Value in Rs. (BSV) 17,018,779
Goods and Services Tax in Rs. (GST) 850,939
Basic Sale Value with GST in Rs. (A = BSV + GST) 17,869,718
Other Charges
Maintenance Deposit in Rs. 342,258
Service Charges including GST in Rs. 236,000
Total Other Charges in Rs. (B) 578,258
Total Sale Value excluding Registration & Stamp Duty in Rs. (C = A + B) 18,447,976
Payment Schedule
Expression of Interest Amount in Rs. (EOI) 300,000
Booking Amount Payable within 30 Days from EOI Date (Less EOI Amount Paid) 10% of A
Payable within 60 Days from EOI Date

15% of A

On Completion of Basement Roof Slab / 31st July 2021, whichever is later 9%
On Completion of First Floor Roof Slab / 30th November 2021, whichever is later 8%
On Completion of Fifth Floor Roof Slab / 31st March 2022, whichever is later 8%
On Completion of Ninth Floor Roof Slab / 31st July 2022, whichever is later 8%
On Completion of Thirteenth Floor Roof Slab / 30th November 2022, whichever is later 8%
On Completion of Terrace Roof Slab / 31st March 2023, whichever is later 9%
On Completion of Internal Plastering in all the Apartments Excluding Balconies, Utilities, Common Area, Shafts, Ducts, etc. / 31st July 2023, whichever is later 7%
On Completion of Internal Flooring in all the Apartments Excluding Balconies, Utilities, Common Area, Shafts, Ducts, etc. / 30th November 2023, whichever is later 7%
On Completion of Internal Doors & Windows in all the Apartments Excluding Balconies, Utilities, Common Area, Shafts, Ducts, etc. / 31st March 2024, whichever is later 6%
On Offer of Possession - Basic Sale Value (A) & Other Charges (B) 5%
Unit Particulars

Type of Apartment

C
Saleable Built-up Area in sq.ft. (SBA) 2,003.45
Carpet Area in sq.ft. 1,280.17
Basic Sale Value & Other Charges
Basic Sale Value in Rs. (BSV) 19,924,310
Goods and Services Tax in Rs. (GST) 996,216
Basic Sale Value with GST in Rs. (A = BSV + GST)

20,920,526

Other Charges
Maintenance Deposit in Rs. 400,690
Service Charges including GST in Rs. 236,000
Total Other Charges in Rs. (B) 636,690
Total Sale Value excluding Registration & Stamp Duty in Rs. (C = A + B) 21,557,216
Payment Schedule
Expression of Interest Amount in Rs. (EOI) 300,000
Booking Amount Payable within 30 Days from EOI Date (Less EOI Amount Paid) 10% of A
Payable within 60 Days from EOI Date

15% of A

On Completion of Basement Roof Slab / 31st July 2021, whichever is later 9%
On Completion of First Floor Roof Slab / 30th November 2021, whichever is later 8%
On Completion of Fifth Floor Roof Slab / 31st March 2022, whichever is later 8%
On Completion of Ninth Floor Roof Slab / 31st July 2022, whichever is later 8%
On Completion of Thirteenth Floor Roof Slab / 30th November 2022, whichever is later 8%
On Completion of Terrace Roof Slab / 31st March 2023, whichever is later 9%
On Completion of Internal Plastering in all the Apartments Excluding Balconies, Utilities, Common Area, Shafts, Ducts, etc. / 31st July 2023, whichever is later 7%
On Completion of Internal Flooring in all the Apartments Excluding Balconies, Utilities, Common Area, Shafts, Ducts, etc. / 30th November 2023, whichever is later 7%
On Completion of Internal Doors & Windows in all the Apartments Excluding Balconies, Utilities, Common Area, Shafts, Ducts, etc. / 31st March 2024, whichever is later 6%
On Offer of Possession - Basic Sale Value (A) & Other Charges (B) 5%
Unit Particulars
Type of Apartment D
Saleable Built-up Area in sq.ft. (SBA) 2,072.90
Carpet Area in sq.ft. 1,308.68
Basic Sale Value & Other Charges
Basic Sale Value in Rs. (BSV) 19,812,778
Goods and Services Tax in Rs. (GST) 2,377,533
Basic Sale Value with GST in Rs. (A = BSV + GST)

22,190,312

Preferred Location Charges
Green facing - Rs. 500 / sq.ft. - to be added to BSV As Applicable
Other Charges
External & Infrastructure Development Charges (EDC & IDC) in Rs. 576,266
Clubhouse Charges including GST in Rs. 295,000
Service Charges including GST in Rs. 236,000
Maintenance Deposit in Rs. 414,580
Total Other Charges in Rs. (B) 1,521,846
Total Sale Value excluding Registration & Stamp Duty in Rs. (C = A + B) 23,712,158
Payment Schedule
Expression of Interest Amount in Rs. (EOI) 500,000
Booking Amount Payable within 30 Days from EOI Date (Less EOI Amount Paid) 10% of A
EDC & IDC Charges Payable within 30 Days from EOI Date

100%

Amount Payable within 60 Days from EOI Date 10%
Amount Payable within 90 Days from EOI Date 60%
On Completion of Internal Plastering in all the Apartments Excluding Balconies, Utilities, Common Area, Shafts, Ducts, etc. 10%
On Offer of Possession - Basic Sale Value (A) & Other Charges (B) excluding EDC & IDC 10%
Unit Particulars
Type of Apartment E
Saleable Built-up Area in sq.ft. (SBA) 2,343.44
Carpet Area in sq.ft. 1,512.05
Basic Sale Value & Other Charges
Basic Sale Value in Rs. (BSV) 22,398,600
Goods and Services Tax in Rs. (GST) 2,687,832
Basic Sale Value with GST in Rs. (A = BSV + GST)

25,086,432

Preferred Location Charges
Green facing - Rs. 500 / sq.ft. - to be added to BSV As Applicable
Other Charges
External & Infrastructure Development Charges (EDC & IDC) in Rs. 651,476
Clubhouse Charges including GST in Rs. 295,000
Service Charges including GST in Rs. 236,000
Maintenance Deposit in Rs. 468,688
Total Other Charges in Rs. (B) 1,651,164
Total Sale Value excluding Registration & Stamp Duty in Rs. (C = A + B) 26,737,596
Payment Schedule
Expression of Interest Amount in Rs. (EOI) 500,000
Booking Amount Payable within 30 Days from EOI Date (Less EOI Amount Paid) 10% of A
EDC & IDC Charges Payable within 30 Days from EOI Date

100%

Amount Payable within 60 Days from EOI Date 10%
Amount Payable within 90 Days from EOI Date 60%
On Completion of Internal Plastering in all the Apartments Excluding Balconies, Utilities, Common Area, Shafts, Ducts, etc. 10%
On Offer of Possession - Basic Sale Value (A) & Other Charges (B) excluding EDC & IDC 10%
Unit Particulars
Type of Apartment D
Saleable Built-up Area in sq.ft. (SBA) 2,072.90
Carpet Area in sq.ft. 1,308.68
Basic Sale Value & Other Charges
Basic Sale Value in Rs. (BSV) 19,812,778
Goods and Services Tax in Rs. (GST) 2,377,533
Basic Sale Value with GST in Rs. (A = BSV + GST)

22,190,312

Preferred Location Charges
Green facing - Rs. 500 / sq.ft. - to be added to BSV As Applicable
Other Charges
External & Infrastructure Development Charges (EDC & IDC) in Rs. 576,266
Clubhouse Charges including GST in Rs. 295,000
Service Charges including GST in Rs. 236,000
Maintenance Deposit in Rs. 414,580
Total Other Charges in Rs. (B) 1,521,846
Total Sale Value excluding Registration & Stamp Duty in Rs. (C = A + B) 23,712,158
Payment Schedule
Expression of Interest Amount in Rs. (EOI) 500,000
Booking Amount Payable within 30 Days from EOI Date (Less EOI Amount Paid) 10% of A
EDC & IDC Charges Payable within 30 Days from EOI Date

100%

Payable within 60 Day from EOI Date 10% of A
Payable within 90 Day from EOI Date 16%
On Completion of Basement Roof Slab 6%
On Completion of First Floor Roof Slab 6%
On Completion of Fifth Floor Roof Slab 7%
On Completion of Ninth Floor Roof Slab 7%
On Completion of Thirteenth Floor Roof Slab 7%
On Completion of Seventeenth Floor Roof Slab 7%
On Completion of Twenty First Floor Roof Slab 7%
On completion of Terrace Roof Slab 7%
On Completion of Internal Plastering in all the Apartments Excluding Balconies, Utilities, Common Area, Shafts, Ducts, etc. 5%
On Offer of Possession - Basic Sale Value, Maintenance Deposit, Club Membership Fee & Service Charges 5%
Unit Particulars
Type of Apartment E
Saleable Built-up Area in sq.ft. (SBA) 2,343.44
Carpet Area in sq.ft. 1,512.05
Basic Sale Value & Other Charges
Basic Sale Value in Rs. (BSV) 22,398,600
Goods and Services Tax in Rs. (GST) 2,687,832
Basic Sale Value with GST in Rs. (A = BSV + GST)

25,086,432

Preferred Location Charges
Green facing - Rs. 500 / sq.ft. - to be added to BSV As Applicable
Other Charges
External & Infrastructure Development Charges (EDC & IDC) in Rs. 651,476
Clubhouse Charges including GST in Rs. 295,000
Service Charges including GST in Rs. 236,000
Maintenance Deposit in Rs. 468,688
Total Other Charges in Rs. (B) 1,651,164
Total Sale Value excluding Registration & Stamp Duty in Rs. (C = A + B) 26,737,596
Payment Schedule
Expression of Interest Amount in Rs. (EOI) 500,000
Booking Amount Payable within 30 Days from EOI Date (Less EOI Amount Paid) 10% of A
EDC & IDC Charges Payable within 30 Days from EOI Date

100%

Payable within 60 Day from EOI Date 10% of A
Payable within 90 Day from EOI Date 16%
On Completion of Basement Roof Slab 6%
On Completion of First Floor Roof Slab 6%
On Completion of Fifth Floor Roof Slab 7%
On Completion of Ninth Floor Roof Slab 7%
On Completion of Thirteenth Floor Roof Slab 7%
On Completion of Seventeenth Floor Roof Slab 7%
On Completion of Twenty First Floor Roof Slab 7%
On completion of Terrace Roof Slab 7%
On Completion of Internal Plastering in all the Apartments Excluding Balconies, Utilities, Common Area, Shafts, Ducts, etc. 5%
On Offer of Possession - Basic Sale Value, Maintenance Deposit, Club Membership Fee & Service Charges 5%
Unit Particulars
Type of Apartment D
Saleable Built-up Area in sq.ft. (SBA) 2,072.90
Carpet Area in sq.ft. 1,308.68
Basic Sale Value & Other Charges
Basic Sale Value in Rs. (BSV) 22,283,675
Maintenance Deposit in Rs. 414,580
Goods and Services Tax in Rs. (GST) 1,114,184
Basic Sale Value with GST in Rs. (A = BSV + GST)

23,812,439

Payment Schedule
Expression of Interest Amount in Rs. (EOI) 500,000
Booking Amount Payable within 30 Days from EOI Date (Less Expression of Interest Amount Paid) 10% of A
Payable within 60 Days from EOI Date

10% of A

Payable on or before 31st October 2021 10%
On Completion of Basement Roof Slab / 30th April 2022, whichever is later 10%
On Completion of Fifth Floor Roof Slab / 31st October 2022, whichever is later 10%
On Completion of Thirteenth Floor Roof Slab / 30th April 2023, whichever is later 10%
On Completion of Twenty First Floor Roof Slab / 31st October 2023, whichever is later 10%
On Completion of Terrace Roof Slab / 30th April 2024, whichever is later 7.5%
On Completion of Internal Plastering in all the Apartments Excluding Balconies, Utilities, Common Area, Shafts, Ducts, etc. / 31st October 2024, whichever is later 7.5%
On Completion of Internal Flooring in all the Apartments Excluding Balconies, Utilities, Common Area, Shafts, Ducts, etc. / 30th April 2025, whichever is later 7.5%
On Offer of Possession - Basic Sale Value & Maintenance Deposit 7.5%
Unit Particulars
Type of Apartment E
Saleable Built-up Area in sq.ft. (SBA) 2,343.44
Carpet Area in sq.ft. 1,512.05
Basic Sale Value & Other Charges
Basic Sale Value in Rs. (BSV) 25,191,980
Maintenance Deposit in Rs. 468,688
Goods and Services Tax in Rs. (GST) 1,259,599
Basic Sale Value with GST in Rs. (A = BSV + GST)

26,920,267

Payment Schedule
Expression of Interest Amount in Rs. (EOI) 100,000
Booking Amount Payable within 30 Days from EOI Date (Less Expression of Interest Amount Paid) 10% of A
Payable within 60 Days from EOI Date

10% of A

On Completion of Basement Roof Slab / 31st July 2021, whichever is later 10%
On Completion of Fifth Floor Roof Slab / 31st March 2022, whichever is later 10%

On Completion of Ninth Floor Roof Slab / 31st July 2022, whichever is later

10%
On Completion of Twenty First Roof Slab / 31st July 2022, whichever is later 10%
On Completion of Thirteenth Floor Roof Slab / 30th November 2022, whichever is later 10%
On Completion of Terrace Roof Slab / 31st March 2023, whichever is later 7.5%
On Completion of Internal Plastering in all the Apartments Excluding Balconies, Utilities, Common Area, Shafts, Ducts, etc 7.5%
On Completion of Internal Flooring in all the Apartments Excluding Balconies, Utilities, Common Area, Shafts, Ducts, etc. / 30th November 2023, whichever is later 7.5%
On Offer of Possession - Basic Sale Value & Maintenance Deposit 7.5%
yes, I am Interested
Enquire Now