- 1,796 Homes across 2 towers
- AED 619,000 studio entry price
- 81.5% Compact 1,463 studios and 1 bedroom units
- 40/60 Plan 60% paid on handover
- ADCB Escrow RERA project 3741
- 5 Minutes to Emirates Road (E611)
- Payment Plan 60:40
- Completion Q2 2027
- Property Type Residential
Venice 15 Azizi Studio & Apartments at Madinat Al Mataar Dubai
Priced from AED 619,000, Azizi Venice 15 is a 2 tower residential and commercial project by Azizi Developments in Madinat Al Mataar, part of Dubai South. Its 1,796 homes cover studios and 1, 2 and 3 bedroom apartments between 318 and 1,690 sq ft. Tower A rises over 4 basements and a ground floor to 16 upper floors and a roof, and Tower B adds a 17th upper floor on the same base. RERA lists the development as project number 3741, and purchases follow a 40/60 plan that opens with a 10% booking amount.
The schedule splits the price into 3 stages, and the larger share is collected only once the building is finished. Applied to the entry price, the stages work out as follows.
| Milestone | Percentage | AED at entry price |
|---|---|---|
| On booking | 10% | AED 61,900 |
| During construction, 13 installments | 30% | AED 185,700 |
| On handover, at 100% completion | 60% | AED 371,400 |
Off-plan purchases at Azizi Venice 15 carry a 4% Dubai Land Department registration fee. On the AED 619,000 entry unit, the fee is AED 24,760. Together with the 10% booking amount of AED 61,900, the upfront cash needed to reserve the unit is AED 86,660.
| Item | Basis | Amount |
|---|---|---|
| Entry price | Studio | AED 619,000 |
| Booking amount | 10% of price | AED 61,900 |
| DLD registration fee | 4% of price | AED 24,760 |
| Upfront cash to reserve | Booking plus DLD fee | AED 86,660 |
Apartment areas are 318 to 1,690 sq ft. Balconies have a geometric design, interiors use natural colours with high quality finishes, and the building has a Venice inspired façade above a designed entrance lobby.
| Unit Type | Number of Units | Share of Total |
|---|---|---|
| Studio | 844 | 47% |
| 1 Bedroom | 619 | 34.5% |
| 2 Bedroom | 252 | 14% |
| 3 Bedroom | 81 | 4.5% |
| Total Residential Units | 1,796 | 100% |
Apartment areas run from 318 to 1,690 sq ft. Buyers currently see one overall layout plan covering a range of sizes, as areas for individual bedroom types are still to be published. Balconies follow a geometric design, interiors use natural colours with high quality finishes, and the building carries a Venice inspired façade above a designed entrance lobby.
Azizi Venice 15 belongs to the Azizi Venice master community, which is laid out around a large artificial lagoon with clear water and a beach style edge, and is crossed by a network of canals. The plan mixes high rise residential towers with cultural venues, open areas, shopping arcades and walkways landscaped for people on foot. From the tower, residents have direct access to the main boulevard, the waterfront promenade and the community facilities.
Inside the tower, residents have a climate controlled pool open all year, a fully equipped gym, a multipurpose room, a cinema room, a children's play area, a co-working lounge, wellness zones, landscaped courtyards and rooftop terraces. Across the wider community, the plan includes a beachfront, cascading waterfalls, a waterfront boardwalk with floating food and beverage pavilions, boutique shops, waterfront cafés, open air cinemas, shaded jogging tracks, cycling routes and climate controlled pedestrian walkways.
The project is close to the E611 highway, which connects it with Expo City Dubai and Jebel Ali. No metro station serves the area yet. Drive times from the project are listed below.
| Destination | Drive Time by Car |
|---|---|
| Emirates Road (E611) | 5 minutes |
| Al Maktoum International Airport | 7 minutes |
| Dubai Parks and Resorts | 15 minutes |
| Dubai Marina | 20 minutes |
| The Palm Jebel Ali | 15 minutes |
| Mall of the Emirates | 30 minutes |
| Minutes by Car | Facility | Category | Access Road |
|---|---|---|---|
| 11 | Dove Green Private School | School | DIP internal roads |
| 15 | The Arbor School | School | Asiana Road, Al Furjan |
| 19 | Jebel Ali School | School | Remraam Desert Road |
| 22 | Tappy Toes Nursery, Dubai South | Nursery | Sheikh Mohammed Bin Zayed Road (E311) |
| 23 | GEMS Founders School, Dubai South | School | Expo Road |
| 28 | NMC Royal Hospital, DIP | Hospital | Sheikh Mohammed Bin Zayed Road (E311) |
| 32 | Al Noor South Polyclinic | Clinic | E311 and Expo Road |
In April 2024, Dubai approved a new passenger terminal at Al Maktoum International Airport. At full build out, the airport is planned for 260 million passengers a year, with 5 parallel runways and more than 400 aircraft gates. Its first phase, due within 10 years, will handle 150 million passengers, and all Dubai International Airport operations are set to move here, creating housing demand for about 1 million people around Dubai South.
Azizi Developments was set up by Mirwais Azizi in 2007 as part of the Azizi Group, whose history goes back to 1989. The company lists 81+ projects across 9+ communities and holds RERA developer number 1002. Alongside Azizi Venice, the developer is currently selling in Jebel Ali, Palm Deira, Al Barsha South Fourth, Wadi Al Safa 4 and Al Merkadh in MBR City.
- Al Maktoum International Airport is a 7 minute drive from the tower.
- A climate controlled pool and a co-working lounge are available inside the building.
- The community boardwalk offers cafés and floating food pavilions.
- Families get a children's play area within the tower.
- The Q2 2027 handover comes from listings, not from a published DLD completion date.
- No metro station serves the area yet.
- The nearest listed hospital, NMC Royal Hospital, DIP, is a 28 minute drive.
- Only 81 units have 3 bedrooms, which limits choice for larger families.
- No service charge rate has been announced yet.
- 60% of the price falls due at handover, so funds must be ready on completion.
- Foreign ownership in Madinat Al Mataar is granted plot by plot, so confirm the plot status with DLD before booking.
- Ask for the exact floor plan and area of your chosen unit, as unit wise sizes are not yet released.
- Check the sale and purchase agreement to confirm who pays each DLD fee share.
- Review the RERA progress percentage before each installment falls due.
- Request the expected service charge rate in writing before signing.
Why invest in Azizi venice 15
- Airport Demand: New airport drives demand for 1 million residents.
- Low Entry: Entry price at the tower is AED 619,000.
- Easy Payments: Only 40% is due before the handover stage.
- Studio Supply: The building includes 844 studios, its largest category.
- Escrow Protection: Installments are paid into a regulated escrow account.
- Waterfront Setting: Building belongs to a lagoon and canal community.
- Airport Scale: Airport phase 1 will handle 150 million passengers.
- Road Access: Emirates Road is a 5 minute drive away.
Azizi venice 15 at Madinat Al Mataar Dubai Amenities
Neighborhood of Azizi venice 15 at Madinat Al Mataar Dubai
- Emirates Road (E611) 5 Min.
- Al Maktoum International Airport (DWC) 7 Min.
- Expo City Dubai 10 Min.
- Dubai Marina 20 Min.
- Mall of the Emirates 30 Min.
- Dubai International Airport (DXB) 35 Min.
- Healthcare Facilities, Emaar South 15 Min.
- Dove Green Medical Facilities Area 15 Min.
- NMC Royal Hospital, DIP 30 Min.
- Mediclinic Parkview Hospital 35 Min.
- Schools in Emaar South 15 Min.
- Dove Green Private School 15 Min.
- The Arbor School 20 Min.
- Jebel Ali School 20 Min.
- GEMS Founders School, Dubai South 25 Min.
- Emaar South Retail Centre 15 Min.
- The Outlet Village 25 Min.
- Ibn Battuta Mall 30 Min.
- Mall of the Emirates 30 Min.
Frequently Asked Questions
Sent on WhatsApp within 5 minutes. No spam, no callbacks unless you ask.


